Skip to content
Staircases

Handrails,Spindles&BalustradesinPoole

A new handrail, a full set of spindles or a rebuilt balustrade, fitted by the carpenter who trims out the rest of the house.

  • Alex carries out the carpentry himself, from measure to fit
  • Materials he trusts and will not substitute to save a job
  • The site left tidy at the end of every day

★★★★★You deal with Alex from the first visit to the finished job.

Newly fitted pine staircase with spindle balustrade at a landing, walls unfinished
  • 8 yrsIn the trade
  • £5mPublic liability cover
  • 15-mileRadius of Broadstone
  • NVQ 2 & 3Carpentry qualifications

What this involves

Handrails, spindles and balustrades, explained

Handrails and spindles, together with the balustrade they sit in, are the parts of a staircase you actually touch and see every day, and they are usually replaced together because they share the same fixings and the same newel posts. The work ranges from swapping a worn or wobbly handrail, to a full run of new stair spindles, to a balustrade installation that rebuilds the run from the newel up. It suits a staircase that still has a sound structure underneath but looks dated or feels unsafe to hold.

  • Handrails replaced or refitted where the old one has come loose or looks tired
  • A full spindle run replaced where the old one is loose, damaged or dated
  • A balustrade rebuilt from the newel post up, not just patched at the top
Finished staircase with white spindle balustrade and oak-effect treads matching the floorHandrail and spindle detail

What working with us on your staircase looks like

The same process whether it is one handrail or a full balustrade rebuild.

Handrail and spindle work versus a full staircase

Replacing the handrail, spindles and balustrade is not always the right job. Here is how it compares with a new staircase and with a straightforward refurbishment.

Handrails, spindles & balustradesStaircase renovationNew staircase
What changesHandrail, spindles, balustradeTreads, stringers, finishThe whole staircase
Structure disturbedNo, the frame staysSometimesYes
SuitsA sound staircase that looks dated or has a loose railWorn treads or a tired finish on a sound frameA staircase that is structurally unsound or badly placed

Swipe to see every column

What is included

What a handrail, spindle and balustrade job covers as standard.

Site visit and measure

Alex measures the existing staircase in person before anything is designed or priced.

Design agreed up front

Sketches, drawings or AI-generated visuals agreed with you before materials are ordered.

Removal of the old handrail and spindles

The existing run taken out as part of the job before the new one is fitted.

New handrail, spindles and balustrade fitted

The new run fitted to the newel posts.

Dust extraction and floor protection

Used throughout, with the site tidied at the end of every day.

Written quote before booking

A written price agreed before the job is booked in, so there are no surprises on site.

Pricing

What it costs

Every job is priced after a visit

A handrail, spindle and balustrade job is priced on what is actually there: the length of run, the newel posts involved, the timber and spindle profile you choose, and how much of the existing structure can stay. A figure quoted without seeing the staircase would not survive contact with it, so we look first and quote in writing after.

  • A site visit to measure the run and check the newel posts
  • A written quote before anything is booked in
Get a quote

How a handrail, spindle or balustrade job runs

The same eight-step process used on every job, applied to a staircase.

Get in touch

Call or use the quote form to describe the staircase and what is wrong with it.

Talk it through

A rough scope and rough budget agreed over the phone before a visit is booked.

Site visit and measure

The existing handrail, spindles, newels and staircase measured in person.

Design and materials

Pen sketches, drawings or AI-generated visuals used to agree the finished look and the timber before ordering.

Written quote

A written price for the agreed scope, before anything is booked in.

Booked in

A date agreed once the quote is signed off.

The work

Removal of the old run, fitting the new handrail, spindles and balustrade, with dust extraction and floor protection throughout.

Sign off

A final check together before the job is called finished.

What customers say

Reviews from Google.

5.016 reviews on Google

Sami K.

Excellent service, very punctual very tidy, craftsmanship above expectations. genuinely very happy to deal with Alex any time. Sincerely recommend this company it's very refreshing to see a trade person who is proud of his craftsmanship. He is really an artist did not leave a spec of dust Thank you Alex

Nick F.

Alex is fantastic, really diligent and a great guy to have help with a project. He has just laid a solid wooden floor for me. It looks brilliant. The trouble is I'm not sure it's such a great idea to give him a great review as it will make him even more popular and in demand

John B.

What a find a decent ,hardworking person who loves his trade and it shows in his workmanship absolutely excellent. Will be recommending him to anyone who wants any sort of carpentry job. On a final note very reasonably priced for the craftsmanship.

David H.

Alex built and installed our main gate and a side gate in top quality wood to our complete satisfaction and at a very competitive price. He is a very efficient young lad and we would highly recommend him.

CJ W.

Really happy with the bespoke builds carpentry. Great workmanship, clear communication, and the finished result looks amazing. Would definitely recommend.

The things people ask before they book

Answered here, so nobody has to ask when we arrive.

  • How much mess and dust will it make?

    Dust extraction is used throughout, and floors are protected before work starts. The site is left tidy at the end of every day, not just at the end of the job.

  • What happens if something is not right afterwards?

    If something is not right after the job is finished, we come back and put it right.

More about handrails, spindles and balustrades

A wobbly handrail or a loosening balustrade is rarely a problem with the staircase itself. It is usually the newel posts or the fixings that have worked loose over years of use, which is why a handrail and spindle job on a sound staircase does not need to disturb the treads or stringers underneath.

The materials matter as much as the fitting. We only use materials we trust and can rely on, and we would rather not take a job on than fit the wrong ones. That is agreed with you at the design stage, before anything is ordered.

Handrails, spindles & balustrades: questions we get asked

Phrased as customers actually ask them.

Do you replace just the handrail, or does it have to be the whole balustrade?

Just the handrail, if that is all that needs doing. The job is scoped after a site visit to what is actually worn or unsafe, rather than replacing more than is needed.

Can you match new spindles to an existing staircase style?

Yes. The design is agreed with you before any timber is ordered, using sketches, drawings or AI-generated visuals, so the new run suits the rest of the staircase.

Do you do staircase work as part of a bigger renovation?

Yes. Handrails, spindles and balustrades can be quoted on their own, and we also carry out wider carpentry on refurbishments, so tell us what else is planned when you get in touch.

Get a written quote for your handrail, spindle or balustrade job

A site visit and a written price before anything is booked in.

Get a free quote

Tell us what you need and we'll come back with a price. No pressure, no hard sell.

Prefer to talk? Call Bespoke Builds Carpentry on 07960 671999

Get a Free Quote